Project: Tallawara Power Station, Pump Supply and Hydraulic Calculations

Client: TruEnergy, Tallawara NSW

Completed: 2012

Project Description:

TruEnergy required an additional sump pump to manage the stormwater at its Tallawara Power Station. Access Petrotec carried out the necessary hydraulic calculations to determine capacity and pressure drop in the system and specify the pump.

Access Petrotec was further employed to supply the pump and assist with installation and commissioning.