Project: Tallawara Power Station, Pump Supply and Hydraulic Calculations

Client: TruEnergy, NSW

Completed: 2009

Project Description:

TruEnergy required an additional sump pump to manage the stormwater at the Tallawara Power Station in New South Wales. Access Petrotec carried out the necessary hydraulic calculations to determine capacity and pressure drop in the system and specify the pump.

Access Petrotec was further employed to supply the pump and provide assistance with installation and commissioning.