Project: Fabrication and Supply of RO Skids for Rio Tinto Paraburdoo Project
Project Highlights:
- Fabrication of pipe spools and supports in compliance to Rio Tinto RTIO-SS-C111 and RTIO-SS-M198 specifications.
- NDT – 10% RT on pipework as per AS3992 and 100% PT on Lifting Lugs as per AS 1554.5
- Hydrotest of pipe spools for RO skids A and B at a set pressure of 1930 kPa for a duration of 4 hours in compliance to Rio Tinto specification RTIO-SS-M198.
- Assembly of pipe spools, pumps, valves, pressure transmitters, flow transmitters, Grating, HDPE Underlay and RO Vessel Containers.
- Compliance to Rio Tinto Standards and Specifications.
- Third Party Design Verification of Lifting Frame for RO Skids A and B
- Manufacturing Documentation (MDR) in compliance with Rio Tinto standards and specifications.
Project: Leinster B11 Pump Station Electrical & Instrumentation Upgrade
Project Highlights:
- Power system studies and report including the calculations for Load Flow, Short Circuit.
- Development of Single Line Diagram
- Development of MCC schematics, termination drawings, substation layout drawings, small power distribution drawings
- Development of Loop Drawings, PLC panel drawings and Marshalling panel termination drawings
- Performed Engineering calculations for Motors, Instruments, PLC cabinet, Switchgear and other components
- Performed Engineering calculations for cables, battery chargers
- Development of Control system functional description/Control Philosophy
- Development of I/O List, Electrical Load List, Electrical Equipment List and Instrument List
Project: Kambalda Nickel Concentrator Fire Hydrant Upgrade
Project Highlights:
- Assessment of Firewater Hydrant system, Identification of Firewater equipment locations and Identification of piping route for new Firewater Ring Main
- Development of Identification Phase Report
- Establish Firewater demand for Kambalda Concentrator
- Developed PFD for Firewater system
- Development of concept level GA of Firewater Ring Main showing road crossings
- Development of concept level Fire Hydrant Coverage Layout
- Development of concept level Layout for tank and pumps area
- Development of Single Line Diagram for Firewater Pumps and associated electrical infrastructure.
Project: Design, Fabrication and Supply of neat CS Sulphuric Acid Tank
Project Highlights:
- Mechanical Design of tank in compliance with API 650 specifications, Alcoa standards WAESTD014 & WAESTD016
- Development of Shop Fabrication drawings as per AS4458:1997 and ALCOA standards WAESTD186 and
WAESTD191
- Design of platforms in accordance with WAESTD014 Section 4.7
- Fabrication of Gusset Plates, Handrails & Ladders and etc..
- Processing of steel includes cutting, drilling and rolling of plates
- Procurement of all materials
- Leakage Testing and NDT as per AS1710:2007
- Surface Treatment in accordance to Alcoa WAESTD241 Specifications
- Compliance to Alcoa Standards and Specifications.
Projects - 2022
Project: SAG Mill Structural Modifications Project
Project Highlights:
- Prefabrication of plates and structural components off site
- Fabrication of compensating plates, Textension and 2x beams
- Shop detailing fabrication drawing so fall new structural works in accordance to BHP’s standard specifications
- Supply of materials, Laborand Equipment
- Site Installation works including Site Fabrication & Installation
- 10% MPI on all Fillet welds
- Surface Treatment in accordance to BHPNiw Standard SES-106 System PCS06 (Protective Coating Systems)
- Compliance to BHPS tandards and Specifications.
- Manufacturing Documentation (MDR) incompliance to BHP specifications.
Project: Tank Roof Modification Project
Project Highlights:
- Offsite Fabrication of Plates and Structural components.
- Fabrication of Edge Plates, Channels, Backplates and Rolling of plates in compliance with AS1554.1
- Processing of steel includes cutting, drilling and rolling of plates
- Supply of materials, Laborand Equipment.
- Site Installation works including Site Fabrication & Installation
- MPI–Magnetic Particle Test (Site NDT)
- Surface Treatmentin accordance to BHP Niw Specifications
- Compliance to BHP Standards and Specifications.
Project: ABB Design, Supply and Fabrication of Piping
Project Highlights:
- Design, Engineering and 3D modelling of piping between switchroom VSDs and chiller including piping, valves, fittings, flanges, bolting and gaskets in accordance with FMG specification 100-SP-PI-0001
- Design pipe supports for pipe work underneath the switchrooms
- Design pipe supports for pipe work between switch rooms and chiller
- Design of drainage pipe from VSDs to IBC, positioning of one IBC under each switchroom
- Engineering calculation in accordance with AS/NZ guaranteeing safety, functionality, reliability, maintainability of the chiller piping systems.
- Fabrication of piping spools incompliance to AS4041, AS1554.1, AS/NZS 3992
- Supply of specialized valves, IBC, specialized hoses, Pipe Insulation and Fasteners/Gaskets
Project: Substation Fire Suppression system audit
Project Highlights:
- Fire Water System Audit
- Identification of Potential Fire Risks
- Room Integrity Assessment
- Opportunity Framing
- Design Options
- Development of chosen Design Option
- Compliance to A Sand statutory Standards
- Prepare the cost estimate for the Budget approvals
Projects - 2021
Project: Modification of Underground Firewater System
Project Highlights:
- 3D laser scan survey of existing fire water system piping and equipment
- Developed 4 schematic concepts for modification of existing firewater system
- Pressure drop calculation in the proposed new piping and existing piping system
- Design and selection of new Fire Water break tanks and piping system
- Compliance to BHP Under ground Standards and Specifications
Project: Modification of Underground Drainage System
Project Highlights:
- Study of Existing Drainage Water System
- Developed 4 schematic concepts for modification of existing firewater system
- Pressure drop calculation in the proposed new piping and existing piping system
- Design and selection of new Fire Water break tanks and piping system
- Compliance to BHP Underground Standards and Specifications
Project: Design of Underground Pump Station
Project Highlights:
- Developed schematics for different options for PumpHouse Layout
- Design and selection of new Dewatering Pumps and piping system
- Pressure drop calculation in the proposed new piping and existing piping system
- Design of Concrete Flooring and Pump Footings
- Design of Monorail System
- Design of Piping System and Supports
- Compliance to BHP Underground Standards and Specifications
Project: Structural Design, Fabrication and Site Installation of Ore Sorter Plant
Project Highlights:
- Structural Analysis & Design of new expansion structure in STAAD PRO to AS Standards
- Connection design calculations of new expansion structure to AS standards
- 3D modelling in Tekla for Existing & New structure
- GA drawings of new structure including existing structure as phantom
- Fabrication drawings for new structure
- Compliance to BHP Standards and Specifications
Project: Site Installation and Commissioning of Mag Separator Plant
Project Highlights:
- Structural Assembly and Installation of Mag Separator approximately 10 tonne and above.
- Modification of hand-rails and gratings to suit the BHP/AS standards
- Site Fabrication and Installation
- Commissioning of Mag Separator Unit
- Marking of AS-built drawings
- Compliance to BHP Standards and Specifications
Project: Air Receiver Piping works
Project Highlights:
- Detailed engineering design of Compressed Air Piping
- Supply and Fabrication of pipes pools and supports
- Supply of Gaskets, Fasteners & UBolts
- Site Welding and Installation of Air Receiver Piping
- Commissioning of Compressor and Piping
- Preparation of AS-built drawing
- Submission of MDR Documentation
- Compliance to BHP Standards and Specifications
Project: Nickel West Air Compressor Replacement
Project Highlights:
- More than 30% savings in engineering and capital costs of compressors
- Savings of over $1.6 million per year in operating costs (power, water and maintenance) compared to the original plant setup
- Technical and Commercial review of Air Compressor Replacement proposed for BHP’s Kalgoorlie Nickel Smelter, and option evaluation and pricing of several compressor packages
- Eliminated the use of water-cooled compressors, resulting in OPEX savings on cooling towers and circulating pumps
- Design and manufacture of 7 Ingersoll Rand skid-mounted modular screw compressor packages
- Detailed Engineering for BHP Nickel West Compressor House
- Supervision and execution of package fabrication at Ingersoll Rand, China facility
- Manufacturing documentation (MDR’s) in compliance with BHP Billiton Standards
Project: Development of P&ID and Control System Philosophy for Water Management and Discharge in Nelson Bay River
Client: Shree Minerals – Tasmania
Project Highlights:
- Flow Assessment and Development of Control Philosophy.
- Provide inputs to drafting team.
- Review P&ID prepared by Drafting team.
- Obtain Client Approval on the submissions.
Projects - 2019
Project: F2E‐40 Tail Gas Scrubber Intercooler
Client: BHP Nickel West, Kwinana Nickel Refinery WA
Project Highlights:
- Engineering and equipment supply under one roof with reduced interface and thus time saving
- Design and Construction to AS1210 Class 3 and TEMA C
- Stainless Steel 316L fabrication with custom Kammprofile Gaskets
- Design Verification and Registration with WorkSafe Australia
- Manufacturing Documentation (MDR) in compliance with AS1210 and AS4458
Projects- 2018
Project: Air Dryer for Sulphuric Acid Unloading Facility
Client: BHP Billiton / Coogee Chemicals, Kwinana Refinery WA
Project Highlights:
- Engineering and equipment supply under one roof with reduced interface and thus time saving
- Detailed Engineering design in Australia to ensure compliance with AS1210 standards
- Unique split-flow and purge-less air dryer design with the elimination of any emissions
- The air dryer and auxiliary components were all manufactured onto a skid for ease of use and transport
- Stainless steel cladding and aluminium wool insulation were applied to all surfaces exceeding 60⁰C
- All pressure vessels on skid ASME U-Stamp approved and compliant to AS1210 standards
- Manufacturing Documentation (MDR) in compliance with AS1210 and AS4458
Projects - 2017
Project: Bubble Columns, Sulphur Pit Steam Coils, Antifoam Pots, Sulphur Locks & Funnels for KIPIC Al‐Zour Refinery Kuwait
Client: FDH JV, India
Project Highlights:
- Engineering and equipment supply under one roof with reduced interface and thus time saving
- Total fabrication tonnage of 101 tonne total of 54 equipment tags
- Fabrication at our facilities located in Baroda, India
- Fabrication in compliance with ASME Sec. VIII Div 1. and Shell DEP and FDH JV standards
- Inspection by TUV Nord & Bureau Veritas
- Road and sea-transportation of 54 equipment tags of various sizes and weights
- Vessels ready to go for operation after arrival in Kuwait
Project: Nickel Reduction Autoclave H2C-8 E and H2C-8-H for Replacement and Expansion of Nickel Refinery
Client: BHP Billiton Nickel West, Kwinana Nickel Refinery WA
Project Highlights:
- Reducing total cost of ownership to BHP Billiton Nickel West by 25%
- Engineering and equipment supply under one roof with reduced interface and thus time saving
- Total fabrication tonnage of 66 tonne for 2 Autoclaves in Duplex Stainless Steel with 40mm-thick plates used in Shell and 45 mm thick plates used for the dishends
- Plates were imported from Outokumpu, Sweden and Arcelor Mittal, France
- Fabrication of the first Autoclave was completed in record time of 5 months and the second one followed 3 months later
- Detailed Engineering design in Australia to ensure compliance with AS1210 standards
- Approval of Worksafe and Department of Mines 8. Petroleum (DNP)
- Fabrication at our facilities located in Baroda, India
- Inspection by lmel Australia and BHP Billiton
- Manufacturing documentation (MDR) in compliance with A81210 and AS3990
- Vessels ready to go for operation after arrival in Australia
Project: Nitrogen Receiver Expansion of Nickel Refinery
Client: BHP Billiton Nickel West, Kwinana Nickel Refinery WA
Project Highlights:
- Engineering and equipment supply under one roof with reduced interface and thus time saving
- Fabrication at our facilities located in Baroda, India
- Total fabrication tonnage 60 tonne with 50mm shell plates and 63mm dished end plates
- Fabrication was completed on time and within 5 months of the contract being awarded, as well as the equipment arriving on-site before the required delivery date
- Detailed Engineering design in Australia to ensure compliance with AS1210 standards
- Approval of Worksafe and Department of Mines & Petroleum (DMP)
- Manufacturing Documentation (MDR) in compliance with AS1210 and AS4458
- Post Weld Heat Treatment to AS4458
- Vessel underwent full Radiography and additionally Magnetic Particle and Ultrasonic testing
Projects -2016
Project: Ventillation System Study
Client: BHP Billiton Nickel West, Kwinana Nickel Refinery WA
Project Highlights:
- Successfully implemented vent system solution resulting in increased production by 50% and achieving BHP Billiton’s goals of increasing plant throughput
- Analysis of the existing vent system on-site to determine operating data
- 3D-Scanning of the existing venting system
- Process Modelling via HYSIS simulations performed to evaluate optimal solutions
- Design and Engineering for installation of new vent lines
- Design drawings created for new vent lines
- Solution was implemented and solved the existing throughput problems
Projects - 2015
Project: Apollo 2 Project, Geismar Plant, Louisiana, USA
Client: Honeywell USA
Highlights:
- Engineering Design, Manufacture and Delivery of 16 off-pressure vessels compliant to ASME Section VIII Division 1 for Honeywell’s new Refrigerant Plant in Louisiana, USA
- Fabrication at our facilities located in Baroda, India
- Manufacturing documentation (MDR) in compliance with ASME Section VIII (Div 1) and U-Stamp Certification
- Third-Party Inspection by TUV Nord
Projects - 2014
Project: Brine Injection Facilities for Gladstone LNG
Client: Santos Gladstone LNG Project, Queensland
Project Highlights:
- Reducing the total cost of ownership to Santos by 23%
- Engineering and equipment supply under one roof with reduced interface and thus time saving
- Detailed Engineering in Australia to ensure compliance with AS standards
- Majority of drafting in India with engineering checks carried out in Australia
- Software Development in India under the supervision of our Australian team, enabling major savings in software development costs
- Sourcing electronic components including PLCs from European and American manufacturers who are approved by Santos
- Modular design panel to be installed within a self-contained transportable container
- System is designed for a remote unmanned site location
- Assembly of panels in India
- FAT offered in Perth, Australia, prior to despatch to site
Project: Fuel Storage and Refuelling Facilities
Client: Rio Tinto, Western Australia
Project Highlights:
- Increasing cost-savings by 30% due to sourcing from emerging markets
- Carried out Fuel Storage and Distribution facilities design in compliance with Rio Tinto specifications and Australian Standards
- Majority of drafting in India with engineering checks carried out in Australia
- Software Development in India under the supervision of our Australian team, enabling major savings in software development costs
- Sourcing electronic components including PLCs from European, American and Japanese manufacturers who are approved by Rio Tinto
- Assembly of panels in India
- FAT offered in Perth, prior to despatch to site
Projects - 2013
Project: Ammonia Evaporator Replacement
Client: Wesfarmers CSBP, Western Australia
Project Highlights:
- Reducing the total cost of ownership to CSBP by 20%
- Engineering and equipment supply under one roof with reduced interface and thus time saving
- Total fabrication tonnage of 14 tonne
- Fabrication of a one-off Shell and Tube Heat Exchanger was completed in a record time of 4 months
- Approval by Worksafe Australia
- Fabrication at our Partner facilities located in Baroda, India
- Inspection by Lloyds
- Manufacturing documentation (MDR) in compliance with AS1210